Eleven years of work, three plants, and one accountable chain.
Kalag designs, manufactures and installs structural and architectural systems across Iraq — steel and space-frame structures, GRP and GRC cladding, tensile canopies, overhead cranes, landscape works, ready-mix concrete, and plastic bags and film.
What separates the company from most contractors is ownership of production. Three plants of our own mean the drawing, the mould, the panel and the crew fitting it all answer to the same party.
From fabrication work in 2015 to owning the whole chain.
- 2015
The first years
Steel fabrication and cladding work delivered as a specialist subcontractor — the trade learned on live sites, in Iraqi conditions.
- Growth
Façade systems
GRP and GRC programmes on universities and hotels, including 4,000 m² of GRC façade at Al-Shaab University and full domes and galleries in GRP.
- Own production
Three plants
The Erbil plant for GRP, GRC and steel — moulds included, produced in-house. The Baghdad plant for ready-mix concrete. And a plastics plant in Erbil for bags and film.
- Today
Design–manufacture–install
Delivered projects across Baghdad and Erbil, delivered under one scope: engineering, production and installation by Kalag.
Milestone years to be confirmed with the client
We manufacture what we install.
Three production sites, all ours. Nothing is subcontracted out and quoted back to the client — and no schedule depends on a third party’s queue.
Plant 01 · ErbilGRP · GRC · Steel
North Industrial, Erbil, Kurdistan Region, IraqComposite and cement-based cladding and full steel fabrication. Moulds are produced inside the plant in partnership with MF Çelik Yapı of Turkey — which is why bespoke façade geometry does not become a lead-time problem.
Plant 02 · BaghdadReady-mix concrete
Al-Amrya, Baghdad, IraqStructural concrete supplied to residential complexes, hotel programmes and infrastructure works across Baghdad — thirteen- and eight-tower complexes among them, and district works running to thousands of residential plots.
Plant 03 · ErbilPlastic bags & film
North Industrial, Erbil, Kurdistan Region, IraqEvery kind of plain plastic bag in every size, garbage bags, PE sheet and the film laid before blinding concrete is poured — produced to the size and thickness the order calls for.
Mould production in Erbil runs in partnership with MF Çelik Yapı (Turkey), and the moulds themselves are made inside our plant — a Turkish engineering partnership plus in-house tooling, rather than one or the other.
Where we work
Headquarters in Arasat Al-Karada, Baghdad; production in Erbil and Baghdad; delivery from Duhok to Basrah.
- Erbil
- Sulaymaniyah
- Duhok
- Mosul
- Kirkuk
- Baghdad
- Anbar
- Najaf
- Basrah