GRC — Glass Fibre Reinforced ConcreteAl-Shaab University — B5 building
Façade cladding 4,000 m², domes, circular galleries and column cladding
Comprehensive engineering solutions — from design and precision manufacturing in our own plants to installation on site, alongside ready-mix concrete supply.
What We Build
GRC — Glass Fibre Reinforced ConcreteFaçade cladding 4,000 m², domes, circular galleries and column cladding
GRC — Glass Fibre Reinforced ConcreteFaçade cladding
Ready-Mix Concrete Supply+1Design and build, complete package, including concrete supply
GRP Cladding & Interior+3Façade cornice cladding, signage and balcony balustrades
Overhead CranesOverhead crane and water intake unit, Greater Zab River
Kalag specialises in general trading, contracting, engineering and plastic manufacturing — prefabricated, steel and glass building façades, structural steel fabrication and ready-mix concrete. Built on engineering, commercial and on-site expertise dating back to 2015, it provides design, manufacturing and installation under one company.
Three plants of our own: Erbil for GRP, GRC and steel fabrication, a second Erbil plant for plastic bags and film, Baghdad for ready-mix concrete. Nothing is subcontracted out and quoted back to you.
Clear dealings, honest scope, no promises we cannot hold.
A standard held in every detail, not only in the finished view.
Engineered tolerances and controlled stages of work.
Structures built to hold their value long after handover.
Quality starts at the foundation, and durability continues through every project.
Trust built on strong foundationsErbil fabricates our GRP, GRC and steel, and a second Erbil plant makes plastic bags and film. Baghdad produces our ready-mix concrete. What we install, we made — so the schedule and the standard are ours to hold, not a subcontractor’s to explain.
Design, manufacture and installation under a single scope. No gap between the drawing and the site, and nobody to blame in the middle.
Work delivered from Duhok to Basrah since 2015 — universities, hotels, residential towers and infrastructure, in the conditions Iraqi sites actually present.
Raw materials are inspected on arrival, machinery and welding lines calibrated regularly, concrete samples strength-tested and façade panels wind-load tested — so every product matches the approved drawings.
Most contractors do one of these and coordinate the rest. Doing all three is what removes the gaps where projects usually slip.
Detailed shop drawings and engineering models in the latest structural analysis software — loads, tolerances and fixing details resolved before anything is cut.
Precision manufacturing in our own plants in Erbil and Baghdad. Tunnel formwork systems are made in-house, in partnership with MF Çelik Yapı and V.D.M Mihran Group of Turkey.
Our own crews install and commission on site, following safe lifting and installation plans on towers and high-rise buildings, through to handover.
Organisations we have designed, made and built for — across Baghdad and Erbil.
All ClientsRelated companies under the same ownership — from engineering design and contracting to aluminium, trading and travel. Alongside our own fabrication and concrete.
The Group